Part of the Olympia Masterplan, the proposed G-Gate building provides mixed use accommodation for car parking, logistics space, exhibition, theatre, office and plant. G Gate is used as a primary [...]
Nova Place is part of the Nova Victoria scheme, located in the heart of Victoria between Buckingham Palace Road, Bressenden Place and Victoria Street. Nova Place is the third and final phase of [...]
RBG were engaged by Laing O’Rourke to provide multi-faceted Construction Engineering assistance for the Liverpool Street Crossrail project. This involved temporary works within Moorgate Station [...]
The Network Rail Design Services Framework consists of four multi-discipline and 78 single-discipline frameworks. Robert Bird Group are a single discipline supplier on the Civils and Structural [...]
Robert Bird Group (RBG) were appointed at the end of July 2019 to deliver a construction methodology for the new Terminal 2 superstructure at Schiphol Airport in Amsterdam, based on the [...]
The RBG scope was working for Tidal Lagoon Swansea Bay to help them convince Charles Hendry MP that there is a place for tidal lagoon energy amongst the providers to the National Grid, whilst [...]
RBG provided construction engineering services for the new Crossrail station at Paddington. RBG developed several bespoke temporary works items to support the intricate construction scheme.
RBG were engaged by Laing O’Rourke to peer review and certify numerous elements of their construction, primarily involving the temporary works and construction sequence for the Western Ticket Hall.
The Caprice Gold Spa Hotel Istanbul is one of Europe’s largest hotels. It features 1,200 hotel bedrooms, 25 indoor and five outdoor pools/spas, conference facilities, a mosque, and multiple [...]
Located within the Mayfair Conservation Area of London, 75-77 Brook Street is a seven-storey commercial development and is designed for the occupier, Clivedale (Sentia Ltd.), with the intention [...]