Olympia G-Gate

Part of the Olympia Masterplan, the proposed G-Gate building provides mixed use accommodation for car parking, logistics space, exhibition, [...]

Liverpool St Crossrail

RBG were engaged by Laing O’Rourke to provide multi-faceted Construction Engineering assistance for the Liverpool Street Crossrail project. This [...]

Network Rail Design Services Framework

The Network Rail Design Services Framework consists of four multi-discipline and 78 single-discipline frameworks. Robert Bird Group are a single [...]

Schiphol Airport New Terminal 2

Robert Bird Group (RBG) were appointed at the end of July 2019 to deliver a construction methodology for the new Terminal 2 superstructure at [...]

Swansea Tidal Lagoon

The RBG scope was working for Tidal Lagoon Swansea Bay to help them convince Charles Hendry MP that there is a place for tidal lagoon energy [...]

Paddington Crossrail

RBG provided construction engineering services for the new Crossrail station at Paddington. RBG developed several bespoke temporary works items [...]

Tottenham Court Road

RBG were engaged by Laing O’Rourke to peer review and certify numerous elements of their construction, primarily involving the temporary works [...]

Caprice Gold Hotel

The Caprice Gold Spa Hotel Istanbul is one of Europe’s largest hotels. It features 1,200 hotel bedrooms, 25 indoor and five outdoor pools/spas, [...]

75-77 Brook Street

Located within the Mayfair Conservation Area of London, 75-77 Brook Street is a seven-storey commercial development and is designed for the [...]

The Liberty of Southwark

The Liberty of Southwark is a mixed-use office and residential development situated just behind Borough Market bound by historic warehouse [...]

Olympia Public Realm

Located within the Olympia Exhibition Centre in London, Public Realm is an elevated platform sitting between the National and Grand Halls which [...]

Channel Tunnel Rail Link

The CTRL Plant Room and Thameslink East Central Concourse are situated below the Midland Main Line platforms at St Pancras Station. The [...]

Catalyst Building

The Brindley Building is due to be demolished to make way for re-development of the site in the form of the new University Building. The proposed [...]

HS2 C2/C3 Temporary Works

HS2 is a state-of-the-art, high-speed line critical for the UK’s low carbon transport future. It will provide much needed rail capacity across [...]

Clarges

Our client faced significant programme constraints with Block A of the prestigious Clarges Estate. This was due to the relocation of tenants from [...]

Principal Place

Principal Place is a mixed-use development, including a 50-storey residential tower and 20-storey commercial building, constructed alongside the [...]

Olympia G-Gate

Part of the Olympia Masterplan, the proposed G-Gate building provides mixed use accommodation for car parking, logistics space, exhibition, [...]

Liverpool St Crossrail

RBG were engaged by Laing O’Rourke to provide multi-faceted Construction Engineering assistance for the Liverpool Street Crossrail project. This [...]

Network Rail Design Services Framework

The Network Rail Design Services Framework consists of four multi-discipline and 78 single-discipline frameworks. Robert Bird Group are a single [...]

Schiphol Airport New Terminal 2

Robert Bird Group (RBG) were appointed at the end of July 2019 to deliver a construction methodology for the new Terminal 2 superstructure at [...]

Swansea Tidal Lagoon

The RBG scope was working for Tidal Lagoon Swansea Bay to help them convince Charles Hendry MP that there is a place for tidal lagoon energy [...]

Olympia G-Gate

Part of the Olympia Masterplan, the proposed G-Gate building provides mixed use accommodation for car parking, logistics space, exhibition, [...]

Liverpool St Crossrail

RBG were engaged by Laing O’Rourke to provide multi-faceted Construction Engineering assistance for the Liverpool Street Crossrail project. This [...]

Network Rail Design Services Framework

The Network Rail Design Services Framework consists of four multi-discipline and 78 single-discipline frameworks. Robert Bird Group are a single [...]

Schiphol Airport New Terminal 2

Robert Bird Group (RBG) were appointed at the end of July 2019 to deliver a construction methodology for the new Terminal 2 superstructure at [...]

Swansea Tidal Lagoon

The RBG scope was working for Tidal Lagoon Swansea Bay to help them convince Charles Hendry MP that there is a place for tidal lagoon energy [...]

Paddington Crossrail

RBG provided construction engineering services for the new Crossrail station at Paddington. RBG developed several bespoke temporary works items [...]

Tottenham Court Road

RBG were engaged by Laing O’Rourke to peer review and certify numerous elements of their construction, primarily involving the temporary works [...]

Caprice Gold Hotel

The Caprice Gold Spa Hotel Istanbul is one of Europe’s largest hotels. It features 1,200 hotel bedrooms, 25 indoor and five outdoor pools/spas, [...]

Start typing and press Enter to search