Brisbane Cross River RailCross River Rail is a 10.2km rail line between Dutton Park and Bowen Hills, which includes a 5.9km twin tunnel under the Brisbane River and [...]
Liverpool St CrossrailRBG were engaged by Laing O’Rourke to provide multi-faceted Construction Engineering assistance for the Liverpool Street Crossrail project. This [...]
Network Rail Design Services FrameworkThe Network Rail Design Services Framework consists of four multi-discipline and 78 single-discipline frameworks. Robert Bird Group are a single [...]
Paddington CrossrailRBG provided construction engineering services for the new Crossrail station at Paddington. RBG developed several bespoke temporary works items [...]
Tottenham Court RoadRBG were engaged by Laing O’Rourke to peer review and certify numerous elements of their construction, primarily involving the temporary works [...]
HS2 C2/C3 Temporary WorksHS2 is a state-of-the-art, high-speed line critical for the UK’s low carbon transport future. It will provide much needed rail capacity across [...]
Battersea Power Station Phase 3B (Geotechnical Case Study)Phase 3 of the Battersea Power Station Redevelopment is a mixed-use precinct consisting of residential, retail and commercial uses, and features [...]
Crows Nest StationRobert Bird Group teamed up with SMEC, Woods Bagot and NDY to think of an innovative way to deliver the station with a value adding Oversite [...]
Discovery PointThis residential and retail master-planned development is strategically located between the Princes Highway and the Cooks River. The development [...]
Sydney MetroRBG is part of the METRON design consortium which includes Arcadis, Mott McDonald, Foster + Partners, Architectus, Robert Bird Group and [...]
Bank Station Capacity UpgradeRobert Bird Group is working with Dragados as the Civil and Structural Engineers for London Underground’s Bank Station Capacity Upgrade project. [...]
Pendle Hill Station UpgradeRobert Bird Group is the civil and structural engineer for the Transport NSW Pendle Hill Station Easy Access Upgrade Project. This project is [...]
21 Moorfields21 Moorfields is an air-rights commercial development directly above Moorgate Underground (LUL) station, London. Constraints include six railway [...]
Sydney Light Rail PPPSydney Light Rail PPP Project includes the DBOMF of a new CBD and South East Light Rail (CSELR) and upgrade, operation and maintenance of the [...]
Museum Station Easy Access UpgradeMuseum Station is an underground rail station on Sydney’s City Circle line. The station was constructed in the 1920s using cut and cover [...]
Brisbane Cross River RailCross River Rail is a 10.2km rail line between Dutton Park and Bowen Hills, which includes a 5.9km twin tunnel under the Brisbane River and [...]
Liverpool St CrossrailRBG were engaged by Laing O’Rourke to provide multi-faceted Construction Engineering assistance for the Liverpool Street Crossrail project. This [...]
Network Rail Design Services FrameworkThe Network Rail Design Services Framework consists of four multi-discipline and 78 single-discipline frameworks. Robert Bird Group are a single [...]
Paddington CrossrailRBG provided construction engineering services for the new Crossrail station at Paddington. RBG developed several bespoke temporary works items [...]
Tottenham Court RoadRBG were engaged by Laing O’Rourke to peer review and certify numerous elements of their construction, primarily involving the temporary works [...]
Brisbane Cross River RailCross River Rail is a 10.2km rail line between Dutton Park and Bowen Hills, which includes a 5.9km twin tunnel under the Brisbane River and [...]
Liverpool St CrossrailRBG were engaged by Laing O’Rourke to provide multi-faceted Construction Engineering assistance for the Liverpool Street Crossrail project. This [...]
Network Rail Design Services FrameworkThe Network Rail Design Services Framework consists of four multi-discipline and 78 single-discipline frameworks. Robert Bird Group are a single [...]
Paddington CrossrailRBG provided construction engineering services for the new Crossrail station at Paddington. RBG developed several bespoke temporary works items [...]
Tottenham Court RoadRBG were engaged by Laing O’Rourke to peer review and certify numerous elements of their construction, primarily involving the temporary works [...]
HS2 C2/C3 Temporary WorksHS2 is a state-of-the-art, high-speed line critical for the UK’s low carbon transport future. It will provide much needed rail capacity across [...]
Battersea Power Station Phase 3B (Geotechnical Case Study)Phase 3 of the Battersea Power Station Redevelopment is a mixed-use precinct consisting of residential, retail and commercial uses, and features [...]