Liverpool St CrossrailRBG were engaged by Laing O’Rourke to provide multi-faceted Construction Engineering assistance for the Liverpool Street Crossrail project. This [...]
Network Rail Design Services FrameworkThe Network Rail Design Services Framework consists of four multi-discipline and 78 single-discipline frameworks. Robert Bird Group are a single [...]
Paddington CrossrailRBG provided construction engineering services for the new Crossrail station at Paddington. RBG developed several bespoke temporary works items [...]
Tottenham Court RoadRBG were engaged by Laing O’Rourke to peer review and certify numerous elements of their construction, primarily involving the temporary works [...]
HS2 C2/C3 Temporary WorksHS2 is a state-of-the-art, high-speed line critical for the UK’s low carbon transport future. It will provide much needed rail capacity across [...]
Battersea Power Station Phase 3B (Geotechnical Case Study)Phase 3 of the Battersea Power Station Redevelopment is a mixed-use precinct consisting of residential, retail and commercial uses, and features [...]
Bank Station Capacity UpgradeRobert Bird Group is working with Dragados as the Civil and Structural Engineers for London Underground’s Bank Station Capacity Upgrade project. [...]
21 Moorfields21 Moorfields is an air-rights commercial development directly above Moorgate Underground (LUL) station, London. Constraints include six railway [...]
Cannon PlaceCannon Place provides premium office space over Cannon Street Station. The project’s design was inspired by the challenging range of site [...]
Liverpool St CrossrailRBG were engaged by Laing O’Rourke to provide multi-faceted Construction Engineering assistance for the Liverpool Street Crossrail project. This [...]
Network Rail Design Services FrameworkThe Network Rail Design Services Framework consists of four multi-discipline and 78 single-discipline frameworks. Robert Bird Group are a single [...]
Paddington CrossrailRBG provided construction engineering services for the new Crossrail station at Paddington. RBG developed several bespoke temporary works items [...]
Tottenham Court RoadRBG were engaged by Laing O’Rourke to peer review and certify numerous elements of their construction, primarily involving the temporary works [...]
HS2 C2/C3 Temporary WorksHS2 is a state-of-the-art, high-speed line critical for the UK’s low carbon transport future. It will provide much needed rail capacity across [...]
Liverpool St CrossrailRBG were engaged by Laing O’Rourke to provide multi-faceted Construction Engineering assistance for the Liverpool Street Crossrail project. This [...]
Network Rail Design Services FrameworkThe Network Rail Design Services Framework consists of four multi-discipline and 78 single-discipline frameworks. Robert Bird Group are a single [...]
Paddington CrossrailRBG provided construction engineering services for the new Crossrail station at Paddington. RBG developed several bespoke temporary works items [...]
Tottenham Court RoadRBG were engaged by Laing O’Rourke to peer review and certify numerous elements of their construction, primarily involving the temporary works [...]
HS2 C2/C3 Temporary WorksHS2 is a state-of-the-art, high-speed line critical for the UK’s low carbon transport future. It will provide much needed rail capacity across [...]
Battersea Power Station Phase 3B (Geotechnical Case Study)Phase 3 of the Battersea Power Station Redevelopment is a mixed-use precinct consisting of residential, retail and commercial uses, and features [...]
Bank Station Capacity UpgradeRobert Bird Group is working with Dragados as the Civil and Structural Engineers for London Underground’s Bank Station Capacity Upgrade project. [...]