kkia-image-landscape-min
kkia-image-portrait-min

Robert Bird Group were the structural and civil engineers with a multi-disciplinary design team appointed by CCC.

KKIA T5 is designed to function initially as a domestic airport with a capacity up to 12mppa with an option to convert to international flights with a capacity up to 7.5mppa. The overall area of the terminal building is approximately 106,500m2 with a further 7,000m2 for piers. The building acts as a decanting facility to allow the renovation of the existing airport, and as additional capacity thereafter.

The Terminal building provides ground floor arrivals & baggage hall, with a mezzanine departure and retail concourse supported on an 18m x 18m grid. Principle plant is within a technical zone beneath the mezzanine. A diamond module roof truss structure extends 27m beyond the arrival / departure perimeter and has integrated roof light and smoke venting roofing modules.

Elevated departure and ground level roadways provide airside access to both the three level car-park and the arrivals / departure concourses. Airside apron is designed for a variety of aircraft stands for both the domestic and subsequent international configurations. Ancillary buildings include Energy Centre Fire Station.

Project Metrics

Project Value:
$430M USD
Year Completed:
2016
Sectors:
Aviation

Project Metrics

Client:
CCC
Primary Contractor:
TAV with Al-Arrab Contracting Company JV
Architect:
PLP

Project Metrics

Robert Bird Group Services:
Structural and Civil Engineering Design for Terminal and Ancillary Buildings and both Landside and Airside Infrastructure