Located on an 11 hectare greenfield site adjacent to Mill Green Nature Reserve and the A460, this project will deliver a new high end retail village outlet in Cannock. Robert Bird Group provide the Civil, Structural and Geotechnical engineering services including major earthworks, highway access and car parking facilities, SuDS, below ground drainage and structural framing for the village. Due to the geology of the site, the earthworks require in-situ ground improvement techniques such as lime stabilisation to strengthen the soil and avoid long term settlement or slip failure.

Project Metrics

Project Value:
GBP £65million
Year Completed:
2020
Building Metrics:
Site area: 11.2 ha
220m of MSE wall
30,000m3 of topsoil stripped;
23,500m3 removed from site
Sectors:
Retail

Project Metrics

RBG Client:
MacArthur Glen, U+I, Rioja Developments
Primary Contractor:
Bowmer and Kirkland
Architect:
Holder Mathias
Robert Bird Group Services:
Civil Engineering
Geotechnical Engineering
Structural Engineering