Mill Green Village
Located on an 11 hectare greenfield site adjacent to Mill Green Nature Reserve and the A460, this project will deliver a new high end retail village outlet in Cannock. Robert Bird Group provide the Civil, Structural and Geotechnical engineering services including major earthworks, highway access and car parking facilities, SuDS, below ground drainage and structural framing for the village. Due to the geology of the site, the earthworks require in-situ ground improvement techniques such as lime stabilisation to strengthen the soil and avoid long term settlement or slip failure.
Project Metrics
Project Value:
£65million
Year Completed:
2020
Project Metrics:
Site area: 11.2 ha
220m of MSE wall
30,000m3 of topsoil stripped;
23,500m3 removed from site
Environmental Performance:
No Data
Sectors:
Retail
RBG Client:
MacArthur Glen, U+I, Rioja Developments
End Client:
MacArthur Glen, U+I, Rioja Developments
Architect(s):
Holder Mathias
Main Contractor:
Bowmer and Kirkland
RBG Services:
Civil Engineering, Geotechnical Engineering, Structural Engineering