313 Adelaide Street

This project involved the refurbishment of a 23 level commercial development in the centre of Brisbane.

Key technical challenges

  • Demolition methodology for post-tensioned concrete awning structure including lifting analysis.
  • Structural engineering assessment of the structure at all stages of demolition.
  • Design and documentation of new steel framed awning structure, including extensive coordination with architectural and services requirements, and structural engineering assessment of the existing basement structure and retention system to support the new awning.
  • Design and documentation of new suspended structure and structural modifications to the existing structure for the new street level terraces.
  • Structural engineering assessment of the existing roof level structure. Design and documentation of new suspended steel plant platforms.
  • Structural engineering assessment of the existing slabs for new services penetrations.

Project Metrics

Project Value:

1985, Refurbishment 2013

Year Completed:

No Data

Project Metrics:

Area: Approx. 19,000 m2 Levels: 23

Environmental Performance:

5 Star NABERs

Sectors:

Commercial, Retail

RBG Client:

F.A Pidgeon and Son

End Client:

F.A Pidgeon and Son

Architect(s):

DDB Refurbishment, Arkhefield

Main Contractor:

F.A Pidgeon and Son

RBG Services:

Civil Engineering, Construction Engineering, Structural Engineering