The Wandsworth Riverside development provides a high-quality, landscaped Thames-side residential environment and integrates commercial and retail functions at ground level. Individual medium-rise blocks sit above a landscaped podium and two-storey basement. The site was previously a gas works and, to save cost and reduce environmental impact, the excavated contaminated ground has been remediated on site. Phase 4 is now in progress.

Project Value      
£90 million
Year Completed/Status
Phase 3 – 2011
Phase 4 – 2014
Phase 5 – 2014-15
Building Metrics
Phase 3 – 160 apartments
Phase 4 – 143 apartments
Phase 3 GEA – 32,000m2
Phase 4 GEA – 24,000m2
Sectors
Residential
Client
Fraser Property Development

Primary Contractor
Galliford Try Construction
Architect
Carey Jones Chapman Tolcher Architects
Robert Bird Group Services
Structural Engineering
Civil Engineering

Key technical challenges

  • The primary tower structure consists of a composite slab and beam structure. Due to the long beam spans and thin slab, extensive analysis for footfall vibration was required to ensure the structure achieved code requirements and client expectations.
  • Working with the existing structure and developing design solutions that strengthened rather than demolished.
  • Extensive co-ordination with the mechanical engineer to develop a strategy that minimised beam penetrations and beam notches.
  • Differential shortening analysis with consideration of mega truss, steel structure, concrete structure and existing structural elements

Environmental performance

  • 5 Star Greenstar
  • 5 Star NABERs Energy and 4 Star NABERs Water ratings.

Features include

  • Post-tensioned flat slabs minimise structural depth and material content.
  • Two-storey CFA secant piled basement wall.
  • Landscaped reinforced concrete transfer deck at ground level over two-storey basement car park.
  • In-ground services link tunnel between basement and energy centre.
  • Third tower phased such that the slab forms a crash deck over the energy centre with provision to become a floor slab in the future development.

Contact Us

We're not around right now. But you can send us an email and we'll get back to you, asap.

Not readable? Change text. captcha txt

Start typing and press Enter to search