Te Kaha (Canterbury Multi-Use Arena)

Robert Bird Group (RBG), in a collaboration with Vickery Hyett, ME Engineers and other specialist sub-consultants, were appointed to provide [...]

Liverpool St Crossrail

RBG were engaged by Laing O’Rourke to provide multi-faceted Construction Engineering assistance for the Liverpool Street Crossrail project. This [...]

Schiphol Airport New Terminal 2

Robert Bird Group (RBG) were appointed at the end of July 2019 to deliver a construction methodology for the new Terminal 2 superstructure at [...]

Paddington Crossrail

RBG provided construction engineering services for the new Crossrail station at Paddington. RBG developed several bespoke temporary works items [...]

Tottenham Court Road

RBG were engaged by Laing O’Rourke to peer review and certify numerous elements of their construction, primarily involving the temporary works [...]

Circular Quay

Robert Bird Group’s concept design is coming to life as Circular Quay Tower in Sydney is making its ascent. When complete, this new office tower [...]

Channel Tunnel Rail Link

The CTRL Plant Room and Thameslink East Central Concourse are situated below the Midland Main Line platforms at St Pancras Station. The [...]

HS2 C2/C3 Temporary Works

HS2 is a state-of-the-art, high-speed line critical for the UK’s low carbon transport future. It will provide much needed rail capacity across [...]

Clarges

Our client faced significant programme constraints with Block A of the prestigious Clarges Estate. This was due to the relocation of tenants from [...]

Wakefield Street Modular Hotel

The Wakefield Street Hotel development consists a 14-storey building with 2 basement levels. The building will include 190 hotel rooms with the [...]

Te Whare Toroa – Ohakea P8-A Hangars

Construction of hangers and offices to house new P8-A Poseidon aircraft for the New Zealand Defence Force. The building comprises two hangers and [...]

Christchurch Convention Centre

Te Pae, The Christchurch Convention Centre, is a new world class convention and exhibition facility built in Christchurch, New Zealand. It [...]

Principal Place

Principal Place is a mixed-use development, including a 50-storey residential tower and 20-storey commercial building, constructed alongside the [...]

The Parabola

The Parabola project focused around the reuse and refurbishment of the former Commonwealth Institute building in Kensington, London. This [...]

One Blackfriars

One Blackfriars is a 50-story, prime residential tower alongside the Thames in London. Initially engaged by basement builders Laing O’Rourke, [...]

Bloomberg

For the prestigious Bloomberg project in the heart of the City Of London, the client faced significant cost escalation due to programme delays [...]

Te Kaha (Canterbury Multi-Use Arena)

Robert Bird Group (RBG), in a collaboration with Vickery Hyett, ME Engineers and other specialist sub-consultants, were appointed to provide [...]

Liverpool St Crossrail

RBG were engaged by Laing O’Rourke to provide multi-faceted Construction Engineering assistance for the Liverpool Street Crossrail project. This [...]

Schiphol Airport New Terminal 2

Robert Bird Group (RBG) were appointed at the end of July 2019 to deliver a construction methodology for the new Terminal 2 superstructure at [...]

Paddington Crossrail

RBG provided construction engineering services for the new Crossrail station at Paddington. RBG developed several bespoke temporary works items [...]

Tottenham Court Road

RBG were engaged by Laing O’Rourke to peer review and certify numerous elements of their construction, primarily involving the temporary works [...]

Te Kaha (Canterbury Multi-Use Arena)

Robert Bird Group (RBG), in a collaboration with Vickery Hyett, ME Engineers and other specialist sub-consultants, were appointed to provide [...]

Liverpool St Crossrail

RBG were engaged by Laing O’Rourke to provide multi-faceted Construction Engineering assistance for the Liverpool Street Crossrail project. This [...]

Schiphol Airport New Terminal 2

Robert Bird Group (RBG) were appointed at the end of July 2019 to deliver a construction methodology for the new Terminal 2 superstructure at [...]

Paddington Crossrail

RBG provided construction engineering services for the new Crossrail station at Paddington. RBG developed several bespoke temporary works items [...]

Tottenham Court Road

RBG were engaged by Laing O’Rourke to peer review and certify numerous elements of their construction, primarily involving the temporary works [...]

Circular Quay

Robert Bird Group’s concept design is coming to life as Circular Quay Tower in Sydney is making its ascent. When complete, this new office tower [...]

Channel Tunnel Rail Link

The CTRL Plant Room and Thameslink East Central Concourse are situated below the Midland Main Line platforms at St Pancras Station. The [...]

HS2 C2/C3 Temporary Works

HS2 is a state-of-the-art, high-speed line critical for the UK’s low carbon transport future. It will provide much needed rail capacity across [...]